United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Wild Horse Wind Farm 1

Wild Horse Wind Farm 1 is a 60.0 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
03INR0030a
Grid region
ERCOT (Texas)
Developer
Wild Horse Wind Farm I, LLC
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
29 July 2002
Agreement signed
26 July 2006
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem