Howle Solar

Howle Solar is a 60.0 MW solar request withdrawn in the ERCOT interconnection queue, in Ellis County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2018 (completed)
  2. Withdrawn / abandonedMay 2023 (project stopped here)
  3. ConsentedJun 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0075
Grid region
ERCOT (Texas)
Developer
Howle Solar LLC
Connection point (POI)
tap 345kV 1907 Venus - 68090 Sam Sw
Location
Ellis County, Texas
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
14 May 2018
Agreement signed
13 June 2022
Proposed online date
December 2024
Withdrawn
May 2023

Location

Marker shows the centre of Ellis County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ellis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem