United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBuckeye Corpus Fuels Solar
Buckeye Corpus Fuels Solar is a 57.6 MW solar request withdrawn in the ERCOT interconnection queue, in Nueces County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- ConsentedSep 2022 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0397
- Grid region
- ERCOT (Texas)
- Developer
- BAES INFRASTRUCTURE CORPUS CHRISTI SOLAR LLC
- Connection point (POI)
- 8858 McKenzie 138kV
- Location
- Nueces County, Texas
- Technology
- Solar: 57.6 MW
- Total requested
- 57.6 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 20 August 2020
- Agreement signed
- 19 September 2022
- Proposed online date
- February 2025
- Withdrawn
- August 2023
Location
Marker shows the centre of Nueces County; the queue data does not give exact sites.
Other requests in Nueces County
- Sunscape Renewable Energy Solar SLFSolar + storage Β· 523 MW Β· agreement signed
- NavBoot BESSBattery storage Β· 304 MW Β· agreement signed
- Blanquilla BESSBattery storage Β· 201 MW Β· agreement signed
- Project Lynx BESSBattery storage Β· 125 MW Β· agreement signed
- Lantana BESSBattery storage Β· 10.0 MW Β· agreement signed
- Olympic BESSBattery storage Β· 223 MW Β· in study
- BRP Perseus BESSBattery storage Β· 203 MW Β· in study
- Sengun BESSBattery storage Β· 201 MW Β· in study
- Barbara BESSBattery storage Β· 201 MW Β· in study
- Jalisco PeakerGas Β· 184 MW Β· in study
- Jalisco CogenGas Β· 168 MW Β· in study
- SunWave SolarSolar Β· 154 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem