Westoria Storage

Westoria Storage is a 58.0 MW other request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2018 (completed)
  2. Withdrawn / abandonedJan 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0100
Grid region
ERCOT (Texas)
Developer
Brazoria West Solar Project, LLC
Connection point (POI)
tap 138kV 42980 Nash - 43380 W Columbia
Location
Brazoria County, Texas
Technology
Other: 58.0 MW
Total requested
58.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 June 2018
Proposed online date
December 2021
Withdrawn
January 2020

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem