Harlingen Irrigation District 1 Solar

Harlingen Irrigation District 1 Solar is a 54.3 MW solar request withdrawn in the ERCOT interconnection queue, in Cameron County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandonedJul 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0037
Grid region
ERCOT (Texas)
Developer
Six Shooter Floating Solar LLC
Connection point (POI)
The Rangerville (#80103) – Luna (#8656) 138 kV line; AEP
Location
Cameron County, Texas
Technology
Solar: 54.3 MW
Total requested
54.3 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
14 May 2023
Proposed online date
November 2027
Withdrawn
July 2023

Location

Marker shows the centre of Cameron County; the queue data does not give exact sites.