BATTERY STORAGE · ERCOT

Harlingen #1 BESS 1

Harlingen #1 BESS 1 is a 10.0 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Cameron County, Texas.

Queue statusConsented
  1. PlanningQueued May 2025 (completed)
  2. ConsentedJun 2025 (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2026 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
26INR0691
Grid region
ERCOT (Texas)
Developer
Harlingen ESS Assets LLC
Connection point (POI)
TSP Station Name: Harlingen #1 TSP Station Code: HARLIN_1 • Load Name / Load Transformer Name: 69_12_1 Bus #: PTI Bus Number:8321 Voltage (Transmission level kV):69kV Node (associated w/ load/load X
Location
Cameron County, Texas
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Study phase
MRD Approved
Queue status
Active
Entered queue
22 May 2025
Agreement signed
18 June 2025
Proposed online date
March 2026

Location

Marker shows the centre of Cameron County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Cameron County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem