Sheffield Solar (Solar Star 1)

Sheffield Solar (Solar Star 1) is a 51.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0041
Grid region
ERCOT (Texas)
Developer
Solar Star Texas I (SunPower Corp)
Connection point (POI)
Cactus (6579)
Technology
Solar: 51.0 MW
Total requested
51.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
24 July 2013
Proposed online date
September 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem