ONSHORE WIND Β· ERCOTJackson Mountain Wind Ranch 2
Jackson Mountain Wind Ranch 2 is a 60.0 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 09INR0044
- Grid region
- ERCOT (Texas)
- Developer
- Gamesa Energy USA
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 15 May 2007
- Proposed online date
- December 2050
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem