United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Other interconnection queue in MISO (Midcontinent)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9412.5 GW
Active in queue12.5 GW94 requests
Agreement signed1,747 MW9 requests
Withdrawn20157.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

94 requests Β· page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Other project J1490, Randolph County
Other
1,000 MWAgreement signed Randolph, MOMISO Apr 2019target 2024
Replacing 749 MW of coal generation with BESS; Campbell 3
Other
749 MWIn study Ottawa, MIMISO Nov 2023target 2028
Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2
Other
710 MWIn study Sherburne, MNMISO Dec 20222024
Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2
Other
615 MWIn study MISO Jun 2024target 2028
Other project J2694, Christian County
Other
500 MWIn study Christian, ILMISO Sep 2022target 2027
Other project J1488, Randolph County
Other
500 MWAgreement signed Randolph, MOMISO Apr 2019target 2024
Other project J2171, Perry County
Other
500 MWIn study Perry, ILMISO Mar 2022target 2024
Other project J3163, Cass County
Other
479 MWIn study Cass, NDMISO Jul 2022target 2028
Replacing 300 MW of existing coal generation with BESS; Edgewater 5
Other
423 MWIn study MISO Feb 2022target 2025
Surplus; Glacier Moraine
Other
360 MWIn study Cumberland, ILMISO Jul 2024target 2027
Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills
Other
330 MWIn study De Soto Parish, LAMISO Dec 2020target 2024
Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3
Other
322 MWIn study Peoria, ILMISO Jul 2024target 2025
Replacing 303.5 MW BESS with 303.5 MW COAL; Edgewater Unit 5
Other
304 MWIn study Sheboygan, WIMISO Dec 2024target 2025
Surplus; EAI.AECCO SWCT1
Other
300 MWIn study Lonoke, ARMISO Jun 2025target 2028
Other project J2691, Bollinger County
Other
250 MWIn study Bollinger, MOMISO Sep 2022target 2027
Replacing 220 MW of coal generation with BESS; Trenton Channel 9
Other
220 MWIn study Wayne, MIMISO Oct 2023target 2025
Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5
Other
212 MWIn study Des Moines, IAMISO Feb 2022target 2024
Surplus; J834
Other
200 MWIn study Phillips, ARMISO Feb 2025target 2027
Surplus; J1450
Other
150 MWIn study Webster, KYMISO Feb 2025target 2026
Surplus; J1062
Other
150 MWIn study Washtenaw, MIMISO Oct 2024target 2027
Surplus; J875
Other
150 MWIn study Lenawee, MIMISO Oct 2024target 2027
Surplus; Shelby
Other
150 MWIn study Cumberland, ILMISO Jun 2024target 2026
Surplus; J1320
Other
150 MWIn study Branch, MIMISO Aug 2024target 2026
Surplus; J806
Other
149 MWIn study Calhoun, MIMISO target 2026
Other project J3400, Deuel County
Other
142 MWIn study Deuel, SDMISO Mar 2024target 2028
Replacing 135.5 MW with 135.5 MW BESS; Blue Lake Units 1 2 4
Other
136 MWIn study Scott, MNMISO May 2024target 2027
Surplus; J33/J734
Other
135 MWIn study Ford, ILMISO May 2023target 2026
Surplus; J734
Other
135 MWIn study Mclean, ILMISO Dec 2022target 2026
Replacing 124.4 MW of existing gas generation with solar at Woodruff County (formerly Bailey); Woodruff Co Solar
Other
124 MWIn study MISO Feb 20222024
Surplus; J1734
Other
120 MWIn study Lee, IAMISO Nov 2024target 2025
Surplus; J442
Other
120 MWIn study Codington, SDMISO Oct 2023target 2026
Surplus; G736
Other
120 MWIn study Codington, SDMISO Oct 2023target 2026
Surplus; J199/J202
Other
100 MWIn study Tuscola, MIMISO Jul 2024target 2013
Surplus; J909
Other
100 MWIn study Tangipahoa Parish, LAMISO Jan 2025target 2027
Surplus; J947
Other
100 MWIn study MISO Apr 2022target 2023
Surplus; Polaris Solar
Other
100 MWAgreement signed Gratiot, MIMISO Apr 2022target 2023
replacing 100MW of un-built solar with BESS; Mayhew
Other
100 MWIn study Benton, MNMISO Nov 2023target 2025
Surplus; J1314
Other
100 MWIn study Polk, WIMISO Sep 2022target 2025
Surplus; J385
Other
100 MWIn study Chisago, MNMISO Jul 2024target 2026
Surplus; J758
Other
100 MWIn study Calhoun, MIMISO Aug 2024target 2027
Other project J4183
Other
99.9 MWIn study MISO target 2027
Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4
Other
98.8 MWIn study St. Louis, MOMISO Dec 2024target 2025
Surplus; J728
Other
90.0 MWIn study Isabella, MIMISO Aug 2022target 2025
Surplus; J717
Other
90.0 MWIn study Isabella, MIMISO Aug 2022target 2025
Surplus; J1224/J1329
Other
85.1 MWIn study Washtenaw, MIMISO Oct 2024target 2028
Surplus; Old Gold
Other
80.0 MWIn study Worth, IAMISO Jun 2024target 2029
Surplus; Pine River Solar
Other
80.0 MWAgreement signed Gratiot, MIMISO Apr 2022target 2023
Surplus; J986
Other
75.0 MWIn study MISO Apr 2022target 2022
Surplus; J878
Other
60.0 MWIn study MISO Apr 20212024
Surplus; J1067
Other
60.0 MWIn study White, INMISO May 20222024
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)