United States › Grid › Interconnection queues
OTHER · MISOReplacing 124.4 MW of existing gas generation with solar at Woodruff County (formerly Bailey); Woodruff Co Solar
Replacing 124.4 MW of existing gas generation with solar at Woodruff County (formerly Bailey); Woodruff Co Solar is a 124 MW other request in interconnection study in the MISO interconnection queue, connecting to ENTERGY ARKANSAS INC..
Queue statusIn planning
- PlanningQueued Feb 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingOct 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- R1016
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS INC.
- Connection point (POI)
- Bailey 161kV substation(338879)
- Technology
- Solar: 124 MW · Other
- Total requested
- 124 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 18 February 2022
- Proposed online date
- May 2023
- Came online
- October 2024
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem