OTHER · MISOOther project J2691, Bollinger County
Other project J2691, Bollinger County is a 250 MW other request in interconnection study in the MISO interconnection queue, in Bollinger County, Missouri, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2691
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN TRANSMISSION COMPANY OF ILLINOIS
- Connection point (POI)
- 7RUSH - 7BALDWIN 345.0kV
- Location
- Bollinger County, Missouri
- Technology
- Solar: 250 MW · Wind · Battery
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- April 2027
Location
Marker shows the centre of Bollinger County; the queue data does not give exact sites.
Other requests in Bollinger County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem