United States › Grid › Interconnection queues
OTHER · MISOReplacing 300 MW of existing coal generation with BESS; Edgewater 5
Replacing 300 MW of existing coal generation with BESS; Edgewater 5 is a 423 MW other request in interconnection study in the MISO interconnection queue, connecting to Alliant Energy East.
Queue statusIn planning
- PlanningQueued Feb 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- R1015
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Alliant Energy East
- Connection point (POI)
- Edgewater 345kV
- Technology
- Other: 423 MW · Battery
- Total requested
- 423 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 13 February 2022
- Proposed online date
- May 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem