Replacing 300 MW of existing coal generation with BESS; Edgewater 5

Replacing 300 MW of existing coal generation with BESS; Edgewater 5 is a 423 MW other request in interconnection study in the MISO interconnection queue, connecting to Alliant Energy East.

Queue statusIn planning
  1. PlanningQueued Feb 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget May 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1015
Grid region
MISO (Midcontinent)
Utility / transmission owner
Alliant Energy East
Connection point (POI)
Edgewater 345kV
Technology
Other: 423 MW · Battery
Total requested
423 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
13 February 2022
Proposed online date
May 2025

Location

No county location in the queue data.

Power plants in · Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem