United States › Grid › Interconnection queues › Michigan
OTHER · MISOSurplus; J717
Surplus; J717 is a 90.0 MW other request in interconnection study in the MISO interconnection queue, in Isabella County, Michigan, connecting to METC.
Queue statusIn planning
- PlanningQueued Aug 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S1031
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Salt River Substation 138kV
- Location
- Isabella County, Michigan
- Technology
- Solar: 90.0 MW · Other
- Total requested
- 90.0 MW
- Queue status
- Active
- Entered queue
- 19 August 2022
- Proposed online date
- July 2025
Location
Marker shows the centre of Isabella County; the queue data does not give exact sites.
Other requests in Isabella County
- Solar project J4066, Isabella CountySolar · 250 MW · in study
- Solar project J3940, Isabella CountySolar · 214 MW · in study
- Surplus; J728Other · 90.0 MW · in study
- Onshore wind project J728, Isabella CountyOnshore wind · 200 MW · built
- Onshore wind project J717, Isabella CountyOnshore wind · 200 MW · built
- Onshore wind project J1667, Isabella CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project J1536, Isabella CountyOnshore wind · 150 MW · withdrawn
- Solar project J1211, Isabella CountySolar · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem