United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J1211, Isabella County
Solar project J1211, Isabella County is a 50.0 MW solar request withdrawn in the MISO interconnection queue, in Isabella County, Michigan, connecting to CONSUMERS ENERGY COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedFeb 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1211
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CONSUMERS ENERGY COMPANY
- Connection point (POI)
- Vernon - METC Tap 138kV Line
- Location
- Isabella County, Michigan
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA Complete; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 27 April 2019
- Proposed online date
- October 2023
- Withdrawn
- February 2021
Location
Marker shows the centre of Isabella County; the queue data does not give exact sites.
Other requests in Isabella County
- Solar project J4066, Isabella CountySolar Β· 250 MW Β· in study
- Solar project J3940, Isabella CountySolar Β· 214 MW Β· in study
- Surplus; J728Other Β· 90.0 MW Β· in study
- Surplus; J717Other Β· 90.0 MW Β· in study
- Onshore wind project J728, Isabella CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project J717, Isabella CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project J1667, Isabella CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J1536, Isabella CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem