Surplus; J33/J734 is a 135 MW other request in interconnection study in the MISO interconnection queue, in Ford County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued May 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1041
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Gibson City South (347114)
Location
Ford County, Illinois
Technology
Solar: 135 MW · Other
Total requested
135 MW
Queue status
Active
Entered queue
19 May 2023
Proposed online date
April 2026

Location

Marker shows the centre of Ford County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Ford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem