United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

OTHER Β· MISO

Surplus; J1734

Surplus; J1734 is a 120 MW other request in interconnection study in the MISO interconnection queue, in Lee County, Iowa, connecting to ITC MIDWEST.

Queue statusIn planning
  1. PlanningQueued Nov 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1071
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
Wever - Burlington 161 kV
Location
Lee County, Iowa
Technology
Other: 120 MW Β· Battery
Total requested
120 MW
Queue status
Active
Entered queue
15 November 2024
Proposed online date
November 2025

Location

Marker shows the centre of Lee County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Lee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem