United States βΊ Grid βΊ Interconnection queues βΊ Iowa
COAL Β· MISOCoal project G732, Lee County
Coal project G732, Lee County is a 34.0 MW coal request withdrawn in the MISO interconnection queue, in Lee County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2007 (completed)
- Withdrawn / abandonedFeb 2007 (project stopped here)
- ConsentedFeb 2007 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G732
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- 13.2 kV feeding into existing Roquette America electrical infrastructure
- Location
- Lee County, Iowa
- Technology
- Coal: 34.0 MW
- Total requested
- 34.0 MW
- Queue status
- Withdrawn
- Entered queue
- 31 January 2007
- Agreement signed
- 22 February 2007
- Proposed online date
- October 2010
- Withdrawn
- February 2007
Location
Marker shows the centre of Lee County; the queue data does not give exact sites.
Other requests in Lee County
- Surplus; J1734Other Β· 120 MW Β· in study
- Solar project J1734, Lee CountySolar Β· 150 MW Β· built
- Gas project G258, Lee CountyGas Β· 50.0 MW Β· built
- Coal project G761, Lee CountyCoal Β· 28.0 MW Β· built
- Solar project J1471, Lee CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project J3214, Lee CountySolar + storage Β· 185 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem