United States › Grid › Interconnection queues › Iowa
SOLAR · MISOSolar project J1734, Lee County
Solar project J1734, Lee County is a 150 MW solar request built and operating in the MISO interconnection queue, in Lee County, Iowa, connecting to ITC MIDWEST.
Request details
- Queue ID
- J1734
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Burlington Generation - Wever 161kV
- Location
- Lee County, Iowa
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: In Service (with Provisional GIA)
- Queue status
- Operational
- Entered queue
- 24 June 2020
- Agreement signed
- 29 July 2025
- Proposed online date
- June 2024
- Came online
- June 2024
Location
Marker shows the centre of Lee County; the queue data does not give exact sites.
Other requests in Lee County
- Surplus; J1734Other · 120 MW · in study
- Gas project G258, Lee CountyGas · 50.0 MW · built
- Coal project G761, Lee CountyCoal · 28.0 MW · built
- Solar project J1471, Lee CountySolar · 200 MW · withdrawn
- Solar + storage project J3214, Lee CountySolar + storage · 185 MW · withdrawn
- Coal project G732, Lee CountyCoal · 34.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem