United States › Grid › Interconnection queues › Wisconsin

OTHER · MISO

Surplus; J1314

Surplus; J1314 is a 100 MW other request in interconnection study in the MISO interconnection queue, in Polk County, Wisconsin.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1039
Grid region
MISO (Midcontinent)
Connection point (POI)
Apple River 161kV
Location
Polk County, Wisconsin
Technology
Other: 100 MW · Battery
Total requested
100 MW
Queue status
Active
Entered queue
1 September 2022
Proposed online date
June 2025

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Wisconsin · Transmission lines in Wisconsin

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem