United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
GAS Β· MISOGas project J129, Polk County
Gas project J129, Polk County is a 300 MW gas request withdrawn in the MISO interconnection queue, in Polk County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2010 (completed)
- Withdrawn / abandonedApr 2011 (project stopped here)
- ConsentedApr 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J129
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Apple River Stubstation
- Location
- Polk County, Wisconsin
- Technology
- Gas: 300 MW
- Total requested
- 300 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 28 April 2010
- Agreement signed
- 22 April 2011
- Proposed online date
- June 2011
- Withdrawn
- April 2011
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Polk County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem