Gas project J129, Polk County

Gas project J129, Polk County is a 300 MW gas request withdrawn in the MISO interconnection queue, in Polk County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2010 (completed)
  2. Withdrawn / abandonedApr 2011 (project stopped here)
  3. ConsentedApr 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J129
Grid region
MISO (Midcontinent)
Connection point (POI)
Apple River Stubstation
Location
Polk County, Wisconsin
Technology
Gas: 300 MW
Total requested
300 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
28 April 2010
Agreement signed
22 April 2011
Proposed online date
June 2011
Withdrawn
April 2011

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem