United States › Grid › Interconnection queues › Arkansas

OTHER · MISO

Surplus; J834

Surplus; J834 is a 200 MW other request in interconnection study in the MISO interconnection queue, in Phillips County, Arkansas, connecting to ENTERGY ARKANSAS.

Queue statusIn planning
  1. PlanningQueued Feb 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1074
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY ARKANSAS
Connection point (POI)
Ritchie Plant 230 kV Substation
Location
Phillips County, Arkansas
Technology
Other: 200 MW · Battery
Total requested
200 MW
Queue status
Active
Entered queue
28 February 2025
Proposed online date
September 2027

Location

Marker shows the centre of Phillips County; the queue data does not give exact sites.

Power plants in Arkansas · Transmission lines in Arkansas

Other requests in Phillips County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem