United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J3270, Phillips County
Solar project J3270, Phillips County is a 250 MW solar request withdrawn in the MISO interconnection queue, in Phillips County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3270
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- AECC AUBREY - RITCHIE SWYD 230.0kV
- Location
- Phillips County, Arkansas
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 17 April 2024
- Proposed online date
- September 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Phillips County; the queue data does not give exact sites.
Other requests in Phillips County
- Solar project J4196, Phillips CountySolar Β· 300 MW Β· in study
- Surplus; J834Other Β· 200 MW Β· in study
- Solar project J2750, Phillips CountySolar Β· 198 MW Β· in study
- Onshore wind project J3292, Phillips CountyOnshore wind Β· 193 MW Β· in study
- Solar + storage project J3112, Phillips CountySolar + storage Β· 100 MW Β· in study
- Solar project J3141, Phillips CountySolar Β· 100 MW Β· in study
- Solar + storage project J2456, Phillips CountySolar + storage Β· 100 MW Β· in study
- Solar project J834, Phillips CountySolar Β· 100 MW Β· built
- Solar project J663, Phillips CountySolar Β· 100 MW Β· built
- Solar project J3802, Phillips CountySolar Β· 300 MW Β· withdrawn
- Solar project J3893, Phillips CountySolar Β· 214 MW Β· withdrawn
- Solar + storage project J3116, Phillips CountySolar + storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem