United States › Grid › Interconnection queues › Arkansas
SOLAR · MISOSolar project J4196, Phillips County
Solar project J4196, Phillips County is a 300 MW solar request in interconnection study in the MISO interconnection queue, in Phillips County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusIn planning
- PlanningQueued Sep 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J4196
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- GILLETT - ELAINE 115.0kV
- Location
- Phillips County, Arkansas
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 29 September 2025
- Proposed online date
- June 2029
Location
Marker shows the centre of Phillips County; the queue data does not give exact sites.
Other requests in Phillips County
- Surplus; J834Other · 200 MW · in study
- Solar project J2750, Phillips CountySolar · 198 MW · in study
- Onshore wind project J3292, Phillips CountyOnshore wind · 193 MW · in study
- Solar + storage project J3112, Phillips CountySolar + storage · 100 MW · in study
- Solar project J3141, Phillips CountySolar · 100 MW · in study
- Solar + storage project J2456, Phillips CountySolar + storage · 100 MW · in study
- Solar project J834, Phillips CountySolar · 100 MW · built
- Solar project J663, Phillips CountySolar · 100 MW · built
- Solar project J3802, Phillips CountySolar · 300 MW · withdrawn
- Solar project J3270, Phillips CountySolar · 250 MW · withdrawn
- Solar project J3893, Phillips CountySolar · 214 MW · withdrawn
- Solar + storage project J3116, Phillips CountySolar + storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem