United States › Grid › Interconnection queues
OTHER · MISOReplacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2
Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2 is a 615 MW other request in interconnection study in the MISO interconnection queue, connecting to METC.
Queue statusIn planning
- PlanningQueued Jun 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- R1052
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- "18CAMPBELLW”, “18CAMPBELLB
- Technology
- Other: 615 MW · Battery
- Total requested
- 615 MW
- Service type
- Energy only (ERIS)
- Queue status
- Active
- Entered queue
- 24 June 2024
- Proposed online date
- March 2028
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem