Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4

Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4 is a 98.8 MW other request in interconnection study in the MISO interconnection queue, in St. Louis County, Missouri, connecting to AMEREN MISSOURI.

Queue statusIn planning
  1. PlanningQueued Dec 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1059
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN MISSOURI
Connection point (POI)
Meramec Plant – 138KV Switchyard
Location
St. Louis County, Missouri
Technology
Other: 98.8 MW · Battery
Total requested
98.8 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
16 December 2024
Proposed online date
December 2025

Location

Marker shows the centre of St. Louis County; the queue data does not give exact sites.

Power plants in Missouri · Transmission lines in Missouri

Other requests in St. Louis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem