United States › Grid › Interconnection queues › Missouri

GAS · MISO

Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff

Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff is a 824 MW gas request in interconnection study in the MISO interconnection queue, in St. Louis County, Missouri, connecting to AMEREN MISSOURI.

Queue statusIn planning
  1. PlanningQueued May 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1047
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN MISSOURI
Connection point (POI)
Meramec Substation 138kV
Location
St. Louis County, Missouri
Technology
Gas: 824 MW · Other
Total requested
824 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
28 May 2024
Proposed online date
December 2025

Location

Marker shows the centre of St. Louis County; the queue data does not give exact sites.

Power plants in Missouri · Transmission lines in Missouri

Other requests in St. Louis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem