United States › Grid › Interconnection queues › Illinois

OTHER · MISO

Surplus; J734

Surplus; J734 is a 135 MW other request in interconnection study in the MISO interconnection queue, in Mclean County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued Dec 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1040
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Gibson City South (347114)
Location
Mclean County, Illinois
Technology
Solar: 135 MW · Other
Total requested
135 MW
Queue status
Active
Entered queue
16 December 2022
Proposed online date
April 2026

Location

Marker shows the centre of Mclean County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Mclean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem