United States › Grid › Interconnection queues › Illinois

BATTERY STORAGE · PJM

Twin Groves Storage I

Twin Groves Storage I is a 50.0 MW battery storage request with a signed interconnection agreement in the PJM interconnection queue, in Mclean County, Illinois, connecting to ComEd.

Queue statusConsented
  1. PlanningQueued Mar 2020 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Jan 2028 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AF2-252
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Blue Mound 345 kV
Location
Mclean County, Illinois
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Active
Entered queue
27 March 2020
Proposed online date
January 2028

Location

Marker shows the centre of Mclean County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Mclean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem