United States › Grid › Interconnection queues › Illinois

WIND + STORAGE · MISO

Surplus; G876/G877

Surplus; G876/G877 is a 400 MW wind + storage request in interconnection study in the MISO interconnection queue, in Mclean County, Illinois, connecting to GREAT RIVER ENERGY.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget May 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1036
Grid region
MISO (Midcontinent)
Utility / transmission owner
GREAT RIVER ENERGY
Connection point (POI)
Dickinson 345 kV, Buffalo, MN
Location
Mclean County, Illinois
Technology
Wind: 400 MW · Other
Total requested
400 MW
Queue status
Active
Entered queue
9 September 2022
Proposed online date
May 2025

Location

Marker shows the centre of Mclean County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Mclean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem