United States › Grid › Interconnection queues › Michigan

OTHER · MISO

Surplus; J1224/J1329

Surplus; J1224/J1329 is a 85.1 MW other request in interconnection study in the MISO interconnection queue, in Washtenaw County, Michigan, connecting to ITC.

Queue statusIn planning
  1. PlanningQueued Oct 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1065
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC
Connection point (POI)
Majestic 345kV to Milan 345kV
Location
Washtenaw County, Michigan
Technology
Other: 85.1 MW · Battery
Total requested
85.1 MW
Queue status
Active
Entered queue
7 October 2024
Proposed online date
September 2028

Location

Marker shows the centre of Washtenaw County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in Washtenaw County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem