United States › Grid › Interconnection queues › Michigan

OTHER · MISO

Replacing 749 MW of coal generation with BESS; Campbell 3

Replacing 749 MW of coal generation with BESS; Campbell 3 is a 749 MW other request in interconnection study in the MISO interconnection queue, in Ottawa County, Michigan, connecting to METC.

Queue statusIn planning
  1. PlanningQueued Nov 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1040
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Campbell Substation 345kV
Location
Ottawa County, Michigan
Technology
Other: 749 MW · Battery
Total requested
749 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
9 November 2023
Proposed online date
March 2028

Location

Marker shows the centre of Ottawa County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in Ottawa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem