United States › Grid › Interconnection queues › Michigan
OTHER · MISOReplacing 749 MW of coal generation with BESS; Campbell 3
Replacing 749 MW of coal generation with BESS; Campbell 3 is a 749 MW other request in interconnection study in the MISO interconnection queue, in Ottawa County, Michigan, connecting to METC.
Queue statusIn planning
- PlanningQueued Nov 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- R1040
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Campbell Substation 345kV
- Location
- Ottawa County, Michigan
- Technology
- Other: 749 MW · Battery
- Total requested
- 749 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 9 November 2023
- Proposed online date
- March 2028
Location
Marker shows the centre of Ottawa County; the queue data does not give exact sites.
Other requests in Ottawa County
- Solar project J1663, Ottawa CountySolar · 200 MW · under construction
- Gas project J4159, Ottawa CountyGas · 664 MW · in study
- Gas project J4160, Ottawa CountyGas · 425 MW · in study
- Battery storage project J2499, Ottawa CountyBattery storage · 100 MW · in study
- Battery storage project J1880, Ottawa CountyBattery storage · 60.0 MW · in study
- Battery storage project J1984, Ottawa CountyBattery storage · 50.0 MW · in study
- Coal project G479, Ottawa CountyCoal · 29.0 MW · built
- Battery storage project J3258, Ottawa CountyBattery storage · 200 MW · withdrawn
- Battery storage project J3320, Ottawa CountyBattery storage · 200 MW · withdrawn
- Solar project J1556, Ottawa CountySolar · 200 MW · withdrawn
- Solar project J1527, Ottawa CountySolar · 200 MW · withdrawn
- Onshore wind project J931, Ottawa CountyOnshore wind · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem