OTHER Β· MISOSurplus; J878
Surplus; J878 is a 60.0 MW other request in interconnection study in the MISO interconnection queue.
Queue statusIn planning
- PlanningQueued Apr 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingDec 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S1005
- Grid region
- MISO (Midcontinent)
- Technology
- Other: 60.0 MW Β· Battery
- Total requested
- 60.0 MW
- Queue status
- Active
- Entered queue
- 2 April 2021
- Came online
- December 2024
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem