United States › Grid › Interconnection queues › Illinois
OTHER · MISOSurplus; Shelby
Surplus; Shelby is a 150 MW other request in interconnection study in the MISO interconnection queue, in Cumberland County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusIn planning
- PlanningQueued Jun 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S1052
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Neoga South 138kV
- Location
- Cumberland County, Illinois
- Technology
- Solar: 150 MW · Other
- Total requested
- 150 MW
- Queue status
- Active
- Entered queue
- 14 June 2024
- Proposed online date
- September 2026
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Other requests in Cumberland County
- Surplus; Glacier MoraineOther · 360 MW · in study
- Solar project J2662, Cumberland CountySolar · 250 MW · in study
- Solar project J1744, Cumberland CountySolar · 150 MW · in study
- Solar project J1204, Cumberland CountySolar · 199 MW · withdrawn
- Solar project J1771, Cumberland CountySolar · 197 MW · withdrawn
- Battery storage project J2660, Cumberland CountyBattery storage · 150 MW · withdrawn
- Battery storage project J2658, Cumberland CountyBattery storage · 150 MW · withdrawn
- Solar project J2453, Cumberland CountySolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem