Surplus; Shelby

Surplus; Shelby is a 150 MW other request in interconnection study in the MISO interconnection queue, in Cumberland County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued Jun 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1052
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Neoga South 138kV
Location
Cumberland County, Illinois
Technology
Solar: 150 MW · Other
Total requested
150 MW
Queue status
Active
Entered queue
14 June 2024
Proposed online date
September 2026

Location

Marker shows the centre of Cumberland County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Cumberland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem