United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR Β· MISOSolar project J1204, Cumberland County
Solar project J1204, Cumberland County is a 199 MW solar request withdrawn in the MISO interconnection queue, in Cumberland County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMay 2024 (project stopped here)
- ConsentedMar 2024 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1204
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Casey West 345kV Substation
- Location
- Cumberland County, Illinois
- Technology
- Solar: 199 MW
- Total requested
- 199 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 26 April 2019
- Agreement signed
- 21 March 2024
- Proposed online date
- June 2025
- Withdrawn
- May 2024
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Other requests in Cumberland County
- Surplus; Glacier MoraineOther Β· 360 MW Β· in study
- Solar project J2662, Cumberland CountySolar Β· 250 MW Β· in study
- Surplus; ShelbyOther Β· 150 MW Β· in study
- Solar project J1744, Cumberland CountySolar Β· 150 MW Β· in study
- Solar project J1771, Cumberland CountySolar Β· 197 MW Β· withdrawn
- Battery storage project J2660, Cumberland CountyBattery storage Β· 150 MW Β· withdrawn
- Battery storage project J2658, Cumberland CountyBattery storage Β· 150 MW Β· withdrawn
- Solar project J2453, Cumberland CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem