United States › Grid › Interconnection queues › Iowa

OTHER · MISO

Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5

Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5 is a 212 MW other request in interconnection study in the MISO interconnection queue, in Des Moines County, Iowa, connecting to Alliant Energy West.

Queue statusIn planning
  1. PlanningQueued Feb 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1019
Grid region
MISO (Midcontinent)
Utility / transmission owner
Alliant Energy West
Connection point (POI)
Burlington 161kV
Location
Des Moines County, Iowa
Technology
Other: 212 MW · Battery
Total requested
212 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
15 February 2022
Proposed online date
December 2024

Location

Marker shows the centre of Des Moines County; the queue data does not give exact sites.

Power plants in Iowa · Transmission lines in Iowa

Other requests in Des Moines County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem