🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Iowa

GAS · MISO

Replacing 31 MW of generation with linear generators powered by natural gas; Burlington 3

Replacing 31 MW of generation with linear generators powered by natural gas; Burlington 3 is a 31.0 MW gas request withdrawn in the MISO interconnection queue, in Des Moines County, Iowa, connecting to ITC MIDWEST.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2023 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R1043
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
ITCM Burlington 161kV
Location
Des Moines County, Iowa
Technology
Gas: 31.0 MW · Other
Total requested
31.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
1 December 2023
Proposed online date
June 2024
Withdrawn
December 2024

Location

Marker shows the centre of Des Moines County; the queue data does not give exact sites.

Power plants in Iowa · Transmission lines in Iowa

Other requests in Des Moines County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem