United States › Grid › Interconnection queues › Illinois

OTHER · MISO

Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3

Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3 is a 322 MW other request in interconnection study in the MISO interconnection queue, in Peoria County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued Jul 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1055
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
E.D. Edwards 138kV
Location
Peoria County, Illinois
Technology
Other: 322 MW · Battery
Total requested
322 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
12 July 2024
Proposed online date
September 2025

Location

Marker shows the centre of Peoria County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Peoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem