United States βΊ Grid βΊ Interconnection queues βΊ Texas
BATTERY STORAGE Β· MISOBattery storage project J3086, Peoria County
Battery storage project J3086, Peoria County is a 253 MW battery storage request withdrawn in the MISO interconnection queue, in Peoria County, Texas, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3086
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN TRANSMISSION COMPANY OF ILLINOIS
- Connection point (POI)
- New 345kV switchyard, looping in the Fargo-Sandburg 345kV
- Location
- Peoria County, Texas
- Technology
- Battery: 253 MW
- Total requested
- 253 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- November 2026
- Withdrawn
- March 2023
Location
Marker shows the centre of Peoria County; the queue data does not give exact sites.
Other requests in Peoria County
- Onshore wind project J3860, Peoria CountyOnshore wind Β· 500 MW Β· in study
- Onshore wind project J3712, Peoria CountyOnshore wind Β· 400 MW Β· in study
- Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3Other Β· 322 MW Β· in study
- Battery storage project J2377, Peoria CountyBattery storage Β· 300 MW Β· in study
- Battery storage project J3216, Peoria CountyBattery storage Β· 300 MW Β· in study
- Onshore wind project J3078, Peoria CountyOnshore wind Β· 252 MW Β· in study
- Onshore wind project J2275, Peoria CountyOnshore wind Β· 250 MW Β· in study
- Onshore wind project J4007, Peoria CountyOnshore wind Β· 150 MW Β· in study
- Solar project J4004, Peoria CountySolar Β· 392 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem