United States › Grid › Interconnection queues › Illinois
ONSHORE WIND · MISOOnshore wind project J3078, Peoria County
Onshore wind project J3078, Peoria County is a 252 MW onshore wind request in interconnection study in the MISO interconnection queue, in Peoria County, Illinois, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3078
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN TRANSMISSION COMPANY OF ILLINOIS
- Connection point (POI)
- Fargo to Sandburg 345kV
- Location
- Peoria County, Illinois
- Technology
- Wind: 252 MW
- Total requested
- 252 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 12 September 2022
- Proposed online date
- October 2026
Location
Marker shows the centre of Peoria County; the queue data does not give exact sites.
Other requests in Peoria County
- Onshore wind project J3860, Peoria CountyOnshore wind · 500 MW · in study
- Onshore wind project J3712, Peoria CountyOnshore wind · 400 MW · in study
- Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3Other · 322 MW · in study
- Battery storage project J2377, Peoria CountyBattery storage · 300 MW · in study
- Battery storage project J3216, Peoria CountyBattery storage · 300 MW · in study
- Onshore wind project J2275, Peoria CountyOnshore wind · 250 MW · in study
- Onshore wind project J4007, Peoria CountyOnshore wind · 150 MW · in study
- Solar project J4004, Peoria CountySolar · 392 MW · withdrawn
- Battery storage project J3086, Peoria CountyBattery storage · 253 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem