SOLAR Β· MISOSolar project J4004, Peoria County
Solar project J4004, Peoria County is a 392 MW solar request withdrawn in the MISO interconnection queue, in Peoria County, Illinois.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2025 (completed)
- Withdrawn / abandonedJan 2026 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J4004
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Other_
- Location
- Peoria County, Illinois
- Technology
- Solar: 392 MW
- Total requested
- 392 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 3 May 2025
- Proposed online date
- October 2032
- Withdrawn
- January 2026
Location
Marker shows the centre of Peoria County; the queue data does not give exact sites.
Other requests in Peoria County
- Onshore wind project J3860, Peoria CountyOnshore wind Β· 500 MW Β· in study
- Onshore wind project J3712, Peoria CountyOnshore wind Β· 400 MW Β· in study
- Replacing 106 MW Coal with 106 MW BESS; Edwards Unit 3Other Β· 322 MW Β· in study
- Battery storage project J2377, Peoria CountyBattery storage Β· 300 MW Β· in study
- Battery storage project J3216, Peoria CountyBattery storage Β· 300 MW Β· in study
- Onshore wind project J3078, Peoria CountyOnshore wind Β· 252 MW Β· in study
- Onshore wind project J2275, Peoria CountyOnshore wind Β· 250 MW Β· in study
- Onshore wind project J4007, Peoria CountyOnshore wind Β· 150 MW Β· in study
- Battery storage project J3086, Peoria CountyBattery storage Β· 253 MW Β· withdrawn