United States › Grid › Interconnection queues › Louisiana

OTHER · MISO

Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills

Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills is a 330 MW other request in interconnection study in the MISO interconnection queue, in De Soto Parish County, Louisiana, connecting to CLECO POWER.

Queue statusIn planning
  1. PlanningQueued Dec 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1004
Grid region
MISO (Midcontinent)
Utility / transmission owner
CLECO POWER
Connection point (POI)
Dolet Hills 345 kV (Bus #500260)
Location
De Soto Parish County, Louisiana
Technology
Solar: 330 MW · Other
Total requested
330 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
30 December 2020
Proposed online date
December 2024

Location

Marker shows the centre of De Soto Parish County; the queue data does not give exact sites.

Power plants in Louisiana · Transmission lines in Louisiana

Other requests in De Soto Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem