United States › Grid › Interconnection queues › Louisiana

SOLAR · MISO

Solar project J2208, De Soto Parish County

Solar project J2208, De Soto Parish County is a 99.0 MW solar request in interconnection study in the MISO interconnection queue, in De Soto Parish County, Louisiana, connecting to CLECO POWER.

Queue statusIn planning
  1. PlanningQueued Aug 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J2208
Grid region
MISO (Midcontinent)
Utility / transmission owner
CLECO POWER
Connection point (POI)
Mansfield (Bus #500530) to Red River Tap (Bus #500762) 138 kV
Location
De Soto Parish County, Louisiana
Technology
Solar: 99.0 MW
Total requested
99.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Active
Entered queue
27 August 2021
Proposed online date
October 2024

Location

Marker shows the centre of De Soto Parish County; the queue data does not give exact sites.

Power plants in Louisiana · Transmission lines in Louisiana

Other requests in De Soto Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem