United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J3180, De Soto Parish County
Solar project J3180, De Soto Parish County is a 110 MW solar request withdrawn in the MISO interconnection queue, in De Soto Parish County, Louisiana, connecting to CLECO POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3180
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- Dolet Hills
- Location
- De Soto Parish County, Louisiana
- Technology
- Solar: 110 MW
- Total requested
- 110 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- October 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of De Soto Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in De Soto Parish County
- Gas project J4133, De Soto Parish CountyGas Β· 756 MW Β· in study
- Replace 330 MW of CLECO.DPS Unit with solar; Dolet HillsOther Β· 330 MW Β· in study
- Solar project J2208, De Soto Parish CountySolar Β· 99.0 MW Β· in study
- Solar project GEN-2022-108, Desoto Parish CountySolar Β· 100 MW Β· withdrawn
- Solar project J2411, De Soto Parish CountySolar Β· 80.0 MW Β· withdrawn
- Battery storage project J3178, De Soto Parish CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project GEN-2023-030, Desoto Parish CountySolar Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem