United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in ERCOT (Texas) (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7713.4 GW
Active in queue39.5 GW207 requests
Agreement signed16.3 GW91 requests
Withdrawn7713.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

77 requests · page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Hollow Branch Creek Solar SLF
Solar · Hollow Branch Creek Solar LLC
712 MWWithdrawn / abandoned Leon, TXERCOT Dec 2021target 2025
Cosmos Solar
Solar · EDF Renewables Development, Inc.
610 MWWithdrawn / abandoned Wharton, TXERCOT Feb 2021target 2024
Amsterdam Solar II
Solar · Cottonwood Bayou Solar II, LLC
510 MWWithdrawn / abandoned Brazoria, TXERCOT Aug 2021target 2026
Ponta Power Station
Gas · WattBridge Energy, LLC
459 MWWithdrawn / abandoned Cherokee, TXERCOT Feb 2021target 2024
BRP Rhea BESS
Other · BRP Rhea BESS LLC
414 MWWithdrawn / abandoned Rockwall, TXERCOT Dec 2021target 2024
BRP Bachman BESS
Battery storage · BRP Bachman BESS LLC
411 MWWithdrawn / abandoned ERCOT Oct 2021target 2027
BRP Charon BESS
Battery storage · BRP Charon BESS LLC
411 MWWithdrawn / abandoned ERCOT Oct 2021target 2027
Boxcar Solar
Solar · EDF Renewables Development, Inc.
356 MWWithdrawn / abandoned ERCOT Mar 2021target 2027
Christoval Solar
Solar · Bridgelink Cave Springs LLC
324 MWWithdrawn / abandoned Tom Green, TXERCOT Feb 2021target 2024
BRP Parana BESS
Battery storage · BRP Parana BESS
304 MWWithdrawn / abandoned ERCOT May 2021target 2028
Amethyst Storage
Other · Riggs Energy Storage LLC
304 MWWithdrawn / abandoned Kaufman, TXERCOT Aug 2021target 2023
Stump Tail BESS
Other · Moccasin Pointe Grid, LLC
302 MWWithdrawn / abandoned Harris, TXERCOT Apr 2021target 2028
Milky Way Solar
Solar · Aurora Solar LLC
300 MWWithdrawn / abandoned Robertson, TXERCOT Apr 2021target 2025
Welder Solar II
Solar · Welder Solar, LLC
300 MWWithdrawn / abandoned San Patricio, TXERCOT Apr 2021target 2027
Redonda Solar
Solar · J&R Power DevCo, LLC
253 MWWithdrawn / abandoned ERCOT Jan 2021target 2026
Boxcar Solar 2
Solar · EDF Renewables Development, Inc.
251 MWWithdrawn / abandoned ERCOT Jul 2021target 2027
Neal Solar II
Solar · Neal Solar, LLC
214 MWWithdrawn / abandoned Wharton, TXERCOT Nov 2021target 2024
Peeler Solar
Solar · Peeler Solar, LLC
210 MWWithdrawn / abandoned Atascosa, TXERCOT Jun 2021target 2024
BRP Yarra BESS
Battery storage · BRP Yarra BESS LLC
205 MWWithdrawn / abandoned ERCOT Oct 2021target 2025
Kingfisher Energy Storage
Battery storage · Nopalosa Energy Storage, LLC
205 MWWithdrawn / abandoned ERCOT Jul 2021target 2028
Quarter Horse Solar
Solar · Quarter Horse Solar, LLC
204 MWWithdrawn / abandoned Bee, TXERCOT May 2021target 2024
Flagtail BESS
Battery storage · Flagtail LLC
204 MWWithdrawn / abandoned ERCOT Apr 2021target 2026
BRP Tigris BESS
Other · BRP Tigris BESS LLC
202 MWWithdrawn / abandoned Collin, TXERCOT Jun 2021target 2023
BRP Springbok Solar
Solar · Antelope Solar LLC
202 MWWithdrawn / abandoned ERCOT Aug 2021target 2027
BRP Chena BESS
Battery storage · BRP Chena BESS LLC
202 MWWithdrawn / abandoned ERCOT Aug 2021target 2028
Liberty Senate Solar 1
Solar · Senate Solar LLC
202 MWWithdrawn / abandoned ERCOT Mar 2021target 2025
Garcitas Creek Solar
Solar · Garcitas Creek Solar LLC
202 MWWithdrawn / abandoned ERCOT Oct 2021target 2026
Chiltepin Solar
Solar · Chiltepin Solar-Storage, LLC
200 MWWithdrawn / abandoned ERCOT Apr 2021target 2025
Flatland Solar Project
Solar · Flatland Solar Project, LLC
182 MWWithdrawn / abandoned ERCOT May 2021target 2025
CountySeat
Gas · LCRA
181 MWWithdrawn / abandoned Bastrop, TXERCOT Nov 2021target 2026
MexiAlta
Solar · Greenfields Solar LLC
180 MWWithdrawn / abandoned Limestone, TXERCOT Jun 2021target 2023
Clarion Solar
Solar · IBV Energy Partners LLC
180 MWWithdrawn / abandoned Medina, TXERCOT Feb 2021target 2024
BRP Volga BESS
Battery storage · BRP Volga BESS LLC
175 MWWithdrawn / abandoned ERCOT Dec 2021target 2027
Wren Storage
Other · Wren Storage, LLC
170 MWWithdrawn / abandoned Willacy, TXERCOT Jan 2021target 2024
Flag City Storage SLF
Battery storage · Flag City Solar Project, LLC
169 MWWithdrawn / abandoned Jackson, TXERCOT Nov 2021target 2027
Bowhead Solar
Solar · Baffin Bay Solar, LLC
165 MWWithdrawn / abandoned Kleberg, TXERCOT Nov 2021target 2026
Grand Acres
Solar · Fronton Solar 1
153 MWWithdrawn / abandoned Cameron, TXERCOT Oct 2021target 2027
Sibyl 2 Energy Storage
Other · Sibyl Energy Storage, LLC
152 MWWithdrawn / abandoned Fort Bend, TXERCOT May 2021target 2022
Hopslam BESS
Battery storage · Momentum LRC Holdco LLC
151 MWWithdrawn / abandoned ERCOT Mar 2021target 2025
Cody Solar
Solar · Woodlands Energy Renewables LLC
150 MWWithdrawn / abandoned Bell, TXERCOT Apr 2021target 2025
Blue Valley Solar
Solar · Blue Valley Solar, LLC
148 MWWithdrawn / abandoned Val Verde, TXERCOT Nov 2021target 2028
Fronton Solar 1
Solar · Fronton Solar 1
133 MWWithdrawn / abandoned Starr, TXERCOT Oct 2021target 2026
Redding Tech West
Gas · Redding Tech West
130 MWWithdrawn / abandoned Ector, TXERCOT Aug 2021target 2024
Pequin BESS Alt#1
Other · Pequin Energy Storage, LLC
111 MWWithdrawn / abandoned Brazoria, TXERCOT Jan 2021target 2023
Aggie Energy storage
Battery storage · KINGFISHER ENERGY STORAGE LLC
104 MWWithdrawn / abandoned ERCOT Aug 2021target 2026
Ghost Town Storage 2
Other · Ghost Town Storage 2 LLC
103 MWWithdrawn / abandoned Andrews, TXERCOT Jan 2021target 2022
Ghost Town Storage 1
Other · Ghost Town Storage 1 LLC
103 MWWithdrawn / abandoned Andrews, TXERCOT Jan 2021target 2022
White Wing II Energy Storage
Other · White Wing II Energy Storage LLC
102 MWWithdrawn / abandoned San Patricio, TXERCOT Oct 2021target 2025
White Wing I Energy Storage
Other · White Wing I Energy Storage LLC
102 MWWithdrawn / abandoned San Patricio, TXERCOT Oct 2021target 2025
Ocee Creek Solar
Solar · OCI LoneSun LLC
102 MWWithdrawn / abandoned Mclennan, TXERCOT Feb 2021target 2025
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)