United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hollow Branch Creek Solar SLF Solar · Hollow Branch Creek Solar LLC |
712 MW | Withdrawn / abandoned |
| Cosmos Solar Solar · EDF Renewables Development, Inc. |
610 MW | Withdrawn / abandoned |
| Amsterdam Solar II Solar · Cottonwood Bayou Solar II, LLC |
510 MW | Withdrawn / abandoned |
| Ponta Power Station Gas · WattBridge Energy, LLC |
459 MW | Withdrawn / abandoned |
| BRP Rhea BESS Other · BRP Rhea BESS LLC |
414 MW | Withdrawn / abandoned |
| BRP Bachman BESS Battery storage · BRP Bachman BESS LLC |
411 MW | Withdrawn / abandoned |
| BRP Charon BESS Battery storage · BRP Charon BESS LLC |
411 MW | Withdrawn / abandoned |
| Boxcar Solar Solar · EDF Renewables Development, Inc. |
356 MW | Withdrawn / abandoned |
| Christoval Solar Solar · Bridgelink Cave Springs LLC |
324 MW | Withdrawn / abandoned |
| BRP Parana BESS Battery storage · BRP Parana BESS |
304 MW | Withdrawn / abandoned |
| Amethyst Storage Other · Riggs Energy Storage LLC |
304 MW | Withdrawn / abandoned |
| Stump Tail BESS Other · Moccasin Pointe Grid, LLC |
302 MW | Withdrawn / abandoned |
| Milky Way Solar Solar · Aurora Solar LLC |
300 MW | Withdrawn / abandoned |
| Welder Solar II Solar · Welder Solar, LLC |
300 MW | Withdrawn / abandoned |
| Redonda Solar Solar · J&R Power DevCo, LLC |
253 MW | Withdrawn / abandoned |
| Boxcar Solar 2 Solar · EDF Renewables Development, Inc. |
251 MW | Withdrawn / abandoned |
| Neal Solar II Solar · Neal Solar, LLC |
214 MW | Withdrawn / abandoned |
| Peeler Solar Solar · Peeler Solar, LLC |
210 MW | Withdrawn / abandoned |
| BRP Yarra BESS Battery storage · BRP Yarra BESS LLC |
205 MW | Withdrawn / abandoned |
| Kingfisher Energy Storage Battery storage · Nopalosa Energy Storage, LLC |
205 MW | Withdrawn / abandoned |
| Quarter Horse Solar Solar · Quarter Horse Solar, LLC |
204 MW | Withdrawn / abandoned |
| Flagtail BESS Battery storage · Flagtail LLC |
204 MW | Withdrawn / abandoned |
| BRP Tigris BESS Other · BRP Tigris BESS LLC |
202 MW | Withdrawn / abandoned |
| BRP Springbok Solar Solar · Antelope Solar LLC |
202 MW | Withdrawn / abandoned |
| BRP Chena BESS Battery storage · BRP Chena BESS LLC |
202 MW | Withdrawn / abandoned |
| Liberty Senate Solar 1 Solar · Senate Solar LLC |
202 MW | Withdrawn / abandoned |
| Garcitas Creek Solar Solar · Garcitas Creek Solar LLC |
202 MW | Withdrawn / abandoned |
| Chiltepin Solar Solar · Chiltepin Solar-Storage, LLC |
200 MW | Withdrawn / abandoned |
| Flatland Solar Project Solar · Flatland Solar Project, LLC |
182 MW | Withdrawn / abandoned |
| CountySeat Gas · LCRA |
181 MW | Withdrawn / abandoned |
| MexiAlta Solar · Greenfields Solar LLC |
180 MW | Withdrawn / abandoned |
| Clarion Solar Solar · IBV Energy Partners LLC |
180 MW | Withdrawn / abandoned |
| BRP Volga BESS Battery storage · BRP Volga BESS LLC |
175 MW | Withdrawn / abandoned |
| Wren Storage Other · Wren Storage, LLC |
170 MW | Withdrawn / abandoned |
| Flag City Storage SLF Battery storage · Flag City Solar Project, LLC |
169 MW | Withdrawn / abandoned |
| Bowhead Solar Solar · Baffin Bay Solar, LLC |
165 MW | Withdrawn / abandoned |
| Grand Acres Solar · Fronton Solar 1 |
153 MW | Withdrawn / abandoned |
| Sibyl 2 Energy Storage Other · Sibyl Energy Storage, LLC |
152 MW | Withdrawn / abandoned |
| Hopslam BESS Battery storage · Momentum LRC Holdco LLC |
151 MW | Withdrawn / abandoned |
| Cody Solar Solar · Woodlands Energy Renewables LLC |
150 MW | Withdrawn / abandoned |
| Blue Valley Solar Solar · Blue Valley Solar, LLC |
148 MW | Withdrawn / abandoned |
| Fronton Solar 1 Solar · Fronton Solar 1 |
133 MW | Withdrawn / abandoned |
| Redding Tech West Gas · Redding Tech West |
130 MW | Withdrawn / abandoned |
| Pequin BESS Alt#1 Other · Pequin Energy Storage, LLC |
111 MW | Withdrawn / abandoned |
| Aggie Energy storage Battery storage · KINGFISHER ENERGY STORAGE LLC |
104 MW | Withdrawn / abandoned |
| Ghost Town Storage 2 Other · Ghost Town Storage 2 LLC |
103 MW | Withdrawn / abandoned |
| Ghost Town Storage 1 Other · Ghost Town Storage 1 LLC |
103 MW | Withdrawn / abandoned |
| White Wing II Energy Storage Other · White Wing II Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| White Wing I Energy Storage Other · White Wing I Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| Ocee Creek Solar Solar · OCI LoneSun LLC |
102 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)220 · 82.8 GW
- West (non-ISO utilities)339 · 78.3 GW
- PJM (Mid-Atlantic, Midwest)819 · 65.0 GW
- MISO (Midcontinent)267 · 38.5 GW
- NYISO (New York)149 · 23.5 GW
- Southeast (non-ISO utilities)123 · 16.3 GW
- ERCOT (Texas)77 · 13.4 GW
- SPP (Southwest Power Pool)70 · 13.1 GW
- ISO-NE (New England)85 · 8,317 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)