BATTERY STORAGE Β· ERCOT

BRP Chena BESS

BRP Chena BESS is a 202 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0285
Grid region
ERCOT (Texas)
Developer
BRP Chena BESS LLC
Connection point (POI)
Tap 138 kV 1951 Handley SES β€šΓ„Γ¬ 2246 Lakewood
Technology
Battery: 202 MW
Total requested
202 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 August 2021
Proposed online date
December 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem