United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

BRP Yarra BESS

BRP Yarra BESS is a 205 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0357
Grid region
ERCOT (Texas)
Developer
BRP Yarra BESS LLC
Connection point (POI)
138 kV Lake Crest bus #(12492)
Technology
Battery: 205 MW
Total requested
205 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 October 2021
Proposed online date
December 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem