BATTERY STORAGE Β· ERCOT

Kingfisher Energy Storage

Kingfisher Energy Storage is a 205 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0317
Grid region
ERCOT (Texas)
Developer
Nopalosa Energy Storage, LLC
Connection point (POI)
80219 Lobo 345kV
Technology
Battery: 205 MW
Total requested
205 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
8 July 2021
Proposed online date
May 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem