United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTFronton Solar 1
Fronton Solar 1 is a 133 MW solar request withdrawn in the ERCOT interconnection queue, in Starr County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2021 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0373
- Grid region
- ERCOT (Texas)
- Developer
- Fronton Solar 1
- Connection point (POI)
- 8796 Roma Substation 138kV
- Location
- Starr County, Texas
- Technology
- Solar: 133 MW
- Total requested
- 133 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 4 October 2021
- Proposed online date
- December 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of Starr County; the queue data does not give exact sites.
Other requests in Starr County
- Half Moon SolarSolar Β· 513 MW Β· agreement signed
- Bullring Wind 2Onshore wind Β· 304 MW Β· agreement signed
- Bullring Wind 1Onshore wind Β· 304 MW Β· agreement signed
- Diamondback solarSolar Β· 204 MW Β· agreement signed
- Mesteno WindOnshore wind Β· 202 MW Β· agreement signed
- Bullring Wind 3Onshore wind Β· 190 MW Β· agreement signed
- Starr Solar RanchSolar + storage Β· 137 MW Β· agreement signed
- Fierce River SolarSolar + storage Β· 896 MW Β· in study
- Muy Grande SolarSolar Β· 503 MW Β· in study
- Mandolin Solar SLFSolar + storage Β· 300 MW Β· in study
- Fierce River BESSSolar + storage Β· 285 MW Β· in study
- Bessie StorageBattery storage Β· 211 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem