SOLAR Β· ERCOT

Fronton Solar 1

Fronton Solar 1 is a 133 MW solar request withdrawn in the ERCOT interconnection queue, in Starr County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0373
Grid region
ERCOT (Texas)
Developer
Fronton Solar 1
Connection point (POI)
8796 Roma Substation 138kV
Location
Starr County, Texas
Technology
Solar: 133 MW
Total requested
133 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
4 October 2021
Proposed online date
December 2026
Withdrawn
July 2025

Location

Marker shows the centre of Starr County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Starr County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem