SOLAR Β· ERCOT

Liberty Senate Solar 1

Liberty Senate Solar 1 is a 202 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0444
Grid region
ERCOT (Texas)
Developer
Senate Solar LLC
Connection point (POI)
1445 Burwick 345kV
Technology
Solar: 202 MW
Total requested
202 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
1 March 2021
Proposed online date
October 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem