United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Quarter Horse Solar

Quarter Horse Solar is a 204 MW solar request withdrawn in the ERCOT interconnection queue, in Bee County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0053
Grid region
ERCOT (Texas)
Developer
Quarter Horse Solar, LLC
Connection point (POI)
tap 345kV 8689 Tango - 8606 Goddard
Location
Bee County, Texas
Technology
Solar: 204 MW
Total requested
204 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 May 2021
Proposed online date
July 2024
Withdrawn
April 2023

Location

Marker shows the centre of Bee County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem